Golden Cross’ Reedy Creek Project is a high-grade gold opportunity located just 10 km northeast of the Sunday Creek discovery — one of Australia’s most talked-about exploration successes. The project spans 445 km² across two tenements in a region known for producing epizonal gold systems like Fosterville and Costerfield.
Area Covered
Initial Drilling
Owned by Insiders
Adjacent to a billion-dollar discovery, in one of the hottest exploration districts in Australia.
Historical drilling includes hits like 11m @ 31.4 g/t Au and 2m @ 174.42 g/t Au* — still largely untested by modern exploration.
The “Testing the Ladder” approach, used successfully at Sunday Creek, is now being applied to target steeply dipping gold-antimony veins.
A 3 km-long gold-in-soil anomaly has been defined, running parallel to a 7 km regional anticline.
Golden Cross has commenced drilling at Reedy Creek with the goal of uncovering a high-grade, vertically extensive gold system similar in style and scale to other recent Victorian gold discoveries, including Southern Cross Gold’s recent Sunday Creek gold discovery.
Phase 1: 2,000 metres of shallow diamond drilling targeting Prince of Wales & Wieneroider Ridge prospects.
Phase 2: 4,000 metres of follow-up drilling targeting deeper vein extensions and adjacent ladder targets.
Both phases are fully funded and supported by detailed structural mapping and geophysical interpretation.
“Testing the Ladder” approach: focused on intercepting steeply dipping, stacked high-grade quartz veins from single drill setups.
Modern methods applied to historically underexplored targets with demonstrated mineralization.
AI-assisted exploration technology (VRIFY) to help identify and define high-grade targets.
2.0m @ 174.4 g/t gold*
11.0m @ 31.4 g/t gold
0.7m @ 239.6 g/t gold
0.8m @ 21.7 g/t gold
~3km-long gold-in-soil anomaly aligned with regional folding and fault structures, suggesting potential for a large-scale mineralized system.
Multiple untested vein corridors identified from structural and soil mapping.
Option to expand drill program with additional rigs later in 2025, pending
results.
Initial drill results expected by late summer 2025.
Ongoing structural interpretation to refine future targeting.