Golden Cross’ Reedy Creek Project is a high-grade gold opportunity located just 10 km northeast of the Sunday Creek discovery — one of Australia’s most talked-about exploration successes. The project spans 445 km² across two tenements in a region known for producing epizonal gold systems like Fosterville and Costerfield.
Area Covered
Initial Drilling
Owned by Insiders
Adjacent to a billion-dollar discovery, in one of the hottest exploration districts in Australia.
Historical drilling includes hits like 11m @ 31.4 g/t Au and 2m @ 174.42 g/t Au* — still largely untested by modern exploration.
The “Testing the Ladder” approach, used successfully at Sunday Creek, is now being applied to target steeply dipping gold-antimony veins.
A 3 km-long gold-in-soil anomaly has been defined, running parallel to a 7 km regional anticline.
Golden Cross has commenced drilling at Reedy Creek with the goal of uncovering a high-grade, vertically extensive gold system similar in style and scale to other recent Victorian gold discoveries, including Southern Cross Gold’s recent Sunday Creek gold discovery.
Phase 1: 2,000 metres of shallow diamond drilling targeting Prince of Wales & Wieneroider Ridge prospects.
Phase 2: 10,000 metres of follow-up drilling targeting deeper vein extensions and adjacent ladder targets.
Both phases are fully funded and supported by detailed structural mapping and geophysical interpretation.
“Testing the Ladder” approach: focused on intercepting steeply dipping, stacked high-grade quartz veins from single drill setups.
Modern methods applied to historically underexplored targets with demonstrated mineralization.
AI-assisted exploration technology (VRIFY) to help identify and define high-grade targets.
2.0m @ 174.4 g/t gold*
11.0m @ 31.4 g/t gold
0.7m @ 239.6 g/t gold
0.8m @ 21.7 g/t gold
~3km-long gold-in-soil anomaly aligned with regional folding and fault structures, suggesting potential for a large-scale mineralized system.
Multiple untested vein corridors identified from structural and soil mapping.
Option to expand drill program with additional rigs later in 2025, pending
results.
Results from 10,000 m Phase 2 drilling (ongoing).
Ongoing structural interpretation to refine future targeting.